Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Burnley · BB10 · Lancashire

Smoke vent rooflight installation in Burnley

Glass is heavy, and bigger units get heavy fast. Fitting a smoke vent rooflight in Burnley means planning how it travels from the delivery vehicle to the roof without chipping an edge or straining a back. Smaller units go up by hand with two fitters. Larger ones may need a hoist, a scaffold loading bay or a crane, and we tell you at quote stage if that applies. Once it is up, the fitting follows the maker's sequence: seat, fix, seal, finish. We take on work like this across Lancashire.

Guide price from £3,595 · Supply & fit; controls and commissioning by a smoke-control specialist

Burnley guide prices

Vent swap

£3,595 – £6,595including VAT at 20%

Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist

Vent with new controls

£5,745 – £9,595including VAT at 20%

Vent plus new control panel and detection, commissioned by a smoke-control specialist

Multiple vents

£9,595 – £17,995including VAT at 20%

Several stairwells or larger systems, priced from a survey

Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

If you also own a property or a business unit in Nelson, Colne or Accrington, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and BB10, BB11 and BB12 sit comfortably within that pattern.

On the day, we cover

  • Controls, detection and wiring handled by the smoke-control specialist
  • Upstand checked, adapted or rebuilt to the vent maker's drawing
  • Old vent removed with the stairwell kept protected below
  • Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
  • Free area at the stair head — We check the free area the vent must provide before choosing a replacement.

Fitting your smoke vent rooflight, step by step

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a smoke vent rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days per vent.

Regulations for Burnley properties

In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.

Getting a price from photos

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around BB10 and we will come back with a quote or a survey date.

Common questions in Burnley

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

How long does fitting take?

Fitting a smoke vent rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Ask for a quote for your Burnley roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Smoke vents (AOV) in Burnley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote