Inverness guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Covering IV1 and neighbouring districts
If you also own a property or a business unit in Forres, Elgin or Perth, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and IV1, IV3 and IV2 sit comfortably within that pattern.
What the job includes
- New vent fitted, sealed and weathered into the roof
- Controls, detection and wiring handled by the smoke-control specialist
- Commissioning and sign-off carried out by the specialist before handover
- Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
What happens on the day
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a smoke vent rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Planning and building rules in Scotland
In Scotland, smoke ventilation is covered by the domestic or non-domestic Technical Handbook, depending on the building. Vents must be certified products, keep the required free area, and be connected and commissioned by a smoke-control specialist. A building warrant is needed where the system is altered.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, IV1 or nearby, confirms travel.
Common questions in Inverness
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Will my new smoke vent rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Ask for a quote for your Inverness roof. Survey dates are offered based on fitter availability once you are happy with the price.

