Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Chadderton · OL9 · Greater Manchester

Smoke vent rooflight installation in Chadderton

Our guide price for smoke vent rooflight installation starts from £3,595, and the real figure for your roof in Chadderton depends on a handful of things: the size and type of smoke vent rooflight, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Greater Manchester.

Guide price from £3,595 · Supply & fit; controls and commissioning by a smoke-control specialist

Guide prices

Vent swap

£3,595 – £6,595including VAT at 20%

Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist

Vent with new controls

£5,745 – £9,595including VAT at 20%

Vent plus new control panel and detection, commissioned by a smoke-control specialist

Multiple vents

£9,595 – £17,995including VAT at 20%

Several stairwells or larger systems, priced from a survey

Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Fitters travel to the job, so the address is what counts. In Chadderton that means postcode districts OL9, OL1 and OL8, and the same teams can just as easily take on work in Oldham, about 1 mile away, or Royton at roughly 2 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Included in the work

  • New vent fitted, sealed and weathered into the roof
  • Existing vent, actuator and upstand surveyed with the specialist
  • Commissioning and sign-off carried out by the specialist before handover
  • Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
  • Free area at the stair head — We check the free area the vent must provide before choosing a replacement.

How a fitting day runs

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a smoke vent rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days per vent.

Planning and building rules in England

In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, OL9 or nearby, confirms travel.

Common questions in Chadderton

How long does fitting take?

Fitting a smoke vent rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Will my new smoke vent rooflight leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Do commercial rooflights need planning permission?

Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.

Planning a smoke vent rooflight in Chadderton? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Smoke vents (AOV) in Chadderton

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote