Bury guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Bury we cover
Our fitters come to you. For Bury that covers BL9, BL8 and M26, plus nearby Radcliffe and Heywood. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Included in the work
- Commissioning and sign-off carried out by the specialist before handover
- Certified vent and actuator matched to the opening and controls
- New vent fitted, sealed and weathered into the roof
- Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
A typical installation day
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a smoke vent rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, BL9 or nearby, confirms travel.
Common questions in Bury
Do you cover Bury?
Yes. Fitters travel to addresses in Bury and the surrounding districts, including BL9. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
What if my roof opening is the wrong size for the smoke vent rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Questions before you commit? Send them over with your Bury postcode and we will answer them plainly, with a quote alongside.

