Broxburn guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Where our fitters travel
Covering Broxburn means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in EH52, EH53 and EH29, and are happy to quote further out in Livingston and Bathgate. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
What the job includes
- New vent fitted, sealed and weathered into the roof
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- Commissioning and sign-off carried out by the specialist before handover
- Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
A typical installation day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a smoke vent rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days per vent.
Planning and building rules in Scotland
A smoke vent replacement in Scotland has to match the certified performance the building relies on, with controls commissioned by a specialist. Whether a building warrant is needed depends on the work, and we confirm it before quoting.
Getting a price from photos
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around EH52 and we will come back with a quote or a survey date.
Common questions in Broxburn
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
Planning a smoke vent rooflight in Broxburn? Tell us about the roof and we will come back with a clear price in writing.

