Guide prices in Edinburgh & the Lothians
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Edinburgh & the Lothians
Coverage in Edinburgh & the Lothians works by postcode, not by distance from an office. Give us the full postcode and we will confirm whether it is standard cover, as it is for most of Scotland, or one of the few remote and island areas handled by arrangement. Either way, you get a written quote before any work is booked, with travel included in the price.
- Smoke vents (AOV) in Bathgate
- Smoke vents (AOV) in Bonnyrigg
- Smoke vents (AOV) in Broxburn
- Smoke vents (AOV) in Edinburgh
- Smoke vents (AOV) in Livingston
- Smoke vents (AOV) in Musselburgh
- Smoke vents (AOV) in Penicuik
What the job includes
- Existing vent, actuator and upstand surveyed with the specialist
- Certified vent and actuator matched to the opening and controls
- Commissioning and sign-off carried out by the specialist before handover
- Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
- Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
Rules that apply in Scotland
In Scotland, smoke ventilation is covered by the domestic or non-domestic Technical Handbook, depending on the building. Vents must be certified products, keep the required free area, and be connected and commissioned by a smoke-control specialist. A building warrant is needed where the system is altered.
Common questions in Edinburgh & the Lothians
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
How long does fitting take?
Fitting a smoke vent rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

