What the job costs in Briton Ferry
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Briton Ferry we cover
Our fitters come to you. For Briton Ferry that covers SA12, SA7 and SA11, plus nearby Neath and Clydach. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Already bought your unit?
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a sliding rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
What the job includes
- Controls, sensors and any safety stop set up and tested
- Frame fixed and weathered with the membrane dressed up the kerb
- Upstand checked for strength, square and level along its full length
- Guarding on the terrace — We look at how the roof terrace will be guarded before the rooflight is fitted.
- Weight and lifting — We plan the lift for a sliding rooflight before it is ordered.
A typical installation day
Where a job takes one to two days, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a sliding rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Regulations for Briton Ferry properties
In Wales, a new rooflight opening generally needs building regulations approval, and a replacement needs either a scheme-registered installer's certificate or a building notice to the council. We are not registered with a scheme, so we use a building notice and show the fee on the quote. Rooflights must meet 2.2 W/m²K and roof windows 1.4 W/m²K. Planning is tighter than in England: rooflights are not permitted development in conservation areas, National Parks, Areas of Outstanding Natural Beauty or World Heritage Sites, so we check your address before quoting.
What to send for a quick quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SA12 or nearby, confirms travel.
Common questions in Briton Ferry
Does a rooflight need building regulations approval?
In Wales a new opening generally needs building regulations approval. A replacement must be self-certified by a scheme-registered installer or covered by a building notice. We are not registered with a scheme, so replacements we fit go through a building notice, and the council's fee is shown on your quote.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Do I need planning permission for a rooflight in Briton Ferry?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Wales. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Got a unit waiting to go in, or need one sourced? Either way, start with your Briton Ferry address and a couple of photos.

