What the job costs in Briton Ferry
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering SA12 and neighbouring districts
Covering Briton Ferry means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in SA12, SA7 and SA11, and are happy to quote further out in Neath and Clydach. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a conservation rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Flashings in lead or a matching kit, dressed to the covering
- Slates or tiles made good around the frame with tidy cuts
- Rafters trimmed with timbers that suit the existing roof
- Listed building consent — We confirm listed building consent is in place before fitting any rooflight on a listed building.
- Reusing the original covering — We plan to reuse the existing slates or tiles wherever we can.
From arrival to clean-up
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A conservation rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one day.
Do you need permission in Briton Ferry?
Wales sets energy limits of 2.2 W/m²K for rooflights and 1.4 W/m²K for roof windows, and new rooflight openings generally need building regulations approval. Replacement units are controlled fittings; we are not registered with a competent person scheme, so ours are covered by a building notice to the council. Planning permission is needed for rooflights in conservation areas, National Parks, AONBs and World Heritage Sites. We check which applies and include the fee in your quote.
Getting a price from photos
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, SA12 or a neighbouring district.
Common questions in Briton Ferry
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Does a rooflight need building regulations approval?
In Wales a new opening generally needs building regulations approval. A replacement must be self-certified by a scheme-registered installer or covered by a building notice. We are not registered with a scheme, so replacements we fit go through a building notice, and the council's fee is shown on your quote.
Tell us your postcode, SA12 or close by, and what you want fitted. We will reply with the next steps and a quote.

