Guide prices in Esher
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Esher and nearby
Distance is rarely the deciding factor. A roof in East Molesey, 2 miles from Esher, gets the same survey, the same written quote and the same fitting process as one in KT10, KT12 and KT8. What changes the price is the job itself: size of unit, roof type, access and lifting. West Molesey, around 2 miles out, is treated the same way.
Fit-only or supply and fit
There are two ways to do this. Supply and fit means we source a sliding rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
Included in the work
- Frame fixed and weathered with the membrane dressed up the kerb
- Cable routed to the motor, ready for the electrician's final connection, quoted as a separate line
- Controls, sensors and any safety stop set up and tested
- What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.
- Power and safety stops — We confirm the power supply and the safety features before fitting day.
From arrival to clean-up
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sliding rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days.
Regulations for Esher properties
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, KT10 or nearby, confirms travel.
Common questions in Esher
What if my roof opening is the wrong size for the sliding rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
How long does fitting take?
Fitting a sliding rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Ask for a quote for your Esher roof. Survey dates are offered based on fitter availability once you are happy with the price.