Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Potters Bar is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every sliding rooflight we install, from a new opening to a straight swap or a fit-only job. We cover Potters Bar, the EN6 district and the rest of Hertfordshire.

Guide price from £7,795 · Supply & fit

What the job costs in Potters Bar

Compact sliding

£7,795 – £10,795including VAT at 20%

Motorised sliding unit for a stair or hatch opening

Standard sliding

£10,795 – £15,595including VAT at 20%

Larger opening onto a roof terrace

Large sliding

£15,595 – £22,795including VAT at 20%

Big spans, lifting gear and longer installs

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Potters Bar

Our fitters come to you. For Potters Bar that covers EN6, AL9 and WD6, plus nearby Barnet and East Barnet. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

Fit-only or supply and fit

Your unit or ours, the fitting standard is the same. For supply and fit we choose a sliding rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.

Included in the work

  • Frame fixed and weathered with the membrane dressed up the kerb
  • Lifting plan for the unit, often with gear booked for the day
  • Upstand checked for strength, square and level along its full length
  • What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.
  • Power and safety stops — We confirm the power supply and the safety features before fitting day.

A typical installation day

Where a job takes one to two days, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a sliding rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Do you need permission in Potters Bar?

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Help us quote accurately

Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around EN6. That is enough for a first price.

Common questions in Potters Bar

How long does fitting take?

Fitting a sliding rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Planning a sliding rooflight in Potters Bar? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sliding rooflights in Potters Bar

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.