Manchester guide prices
Compact sliding
Motorised sliding unit for a stair or hatch opening
Standard sliding
Larger opening onto a roof terrace
Large sliding
Big spans, lifting gear and longer installs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering M2 and neighbouring districts
Jobs across M2, M1 and M4 are part of our normal cover for Manchester. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Longsight and Salford are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sliding rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What we do on the day
- Lifting plan for the unit, often with gear booked for the day
- Controls, sensors and any safety stop set up and tested
- Upstand checked for strength, square and level along its full length
- Guarding on the terrace — We look at how the roof terrace will be guarded before the rooflight is fitted.
- What the glass slides over — We check the area the glass will cover when open before deciding where the unit goes.
From arrival to clean-up
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a sliding rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around M2 and we will come back with a quote or a survey date.
Common questions in Manchester
Do I need planning permission for a rooflight in Manchester?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Send a few photos and your M2 postcode, and we will put together a written quote for the job.