Guide prices in Essex
Like-for-like swap
Old dome or unit removed and disposed of, new glass rooflight fitted to the existing sound kerb
New upstand and swap
Old kerb taken off, new insulated upstand built, roof covering made good, new unit fitted
Opening or large unit
Electric or larger replacement, including making good inside
Guide ranges for supply & fit; building control notice fee extra in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Essex
Coverage in Essex works by postcode, not by distance from an office. Give us the full postcode and we will confirm whether it is standard cover, as it is for most of England, or one of the few remote and island areas handled by arrangement. Either way, you get a written quote before any work is booked, with travel included in the price.
- Replacements in Basildon
- Replacements in Billericay
- Replacements in Braintree
- Replacements in Brentwood
- Replacements in Canvey Island
- Replacements in Chelmsford
- Replacements in Clacton-on-Sea
- Replacements in Colchester
- Replacements in Frinton-on-Sea
- Replacements in Grays
- Replacements in Hadleigh
- Replacements in Harlow
- Replacements in Harwich
- Replacements in Maldon
- Replacements in Pitsea
- Replacements in Rayleigh
- Replacements in Rochford
- Replacements in Saffron Walden
- Replacements in South Benfleet
- Replacements in South Ockendon
- Replacements in Southend-on-Sea
- Replacements in Stanford-le-Hope
- Replacements in Waltham Abbey
- Replacements in Walton-on-the-Naze
- Replacements in Wickford
- Replacements in Witham
What's included
- Roof membrane repaired and turned up where it meets the kerb
- Kerb inspected for rot, height, level and fall once the old unit is off
- Old rooflight or dome unscrewed, lifted out and taken away for disposal
- Is the kerb worth keeping? — We decide whether the existing kerb can stay only after checking it for rot, height and squareness.
- Dome to glass upgrades — We check that the opening and kerb suit a flat glass unit before quoting a dome-to-glass swap.
Rules that apply in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Common questions in Essex
Do I need planning permission for a rooflight in Essex?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.

