Guide prices in Essex
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Essex
Builders and roofers working in Essex can use us for the rooflight element of a job, wherever the site is in England. Homeowners can book us directly. In both cases the fitters come to the address, the work follows the maker's instructions, and a written quote fixes the price first. Fitting is carried out by vetted teams under S&K's direction.
- Electric opening in Basildon
- Electric opening in Billericay
- Electric opening in Braintree
- Electric opening in Brentwood
- Electric opening in Canvey Island
- Electric opening in Chelmsford
- Electric opening in Clacton-on-Sea
- Electric opening in Colchester
- Electric opening in Frinton-on-Sea
- Electric opening in Grays
- Electric opening in Hadleigh
- Electric opening in Harlow
- Electric opening in Harwich
- Electric opening in Maldon
- Electric opening in Pitsea
- Electric opening in Rayleigh
- Electric opening in Rochford
- Electric opening in Saffron Walden
- Electric opening in South Benfleet
- Electric opening in South Ockendon
- Electric opening in Southend-on-Sea
- Electric opening in Stanford-le-Hope
- Electric opening in Waltham Abbey
- Electric opening in Walton-on-the-Naze
- Electric opening in Wickford
- Electric opening in Witham
What the job includes
- Cable route planned through the kerb or reveal before the lining goes on
- Upstand checked or built to suit the unit and its actuator housing
- Unit fitted, sealed and weathered like a fixed flat rooflight
- Opening onto a side slope — We check where the opening part will sit if the roof is pitched or the unit faces a neighbour.
- Cable length and size — We check the cable run against the maker's limits before planning where the controls go.
Rules that apply in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Common questions in Essex
How long does fitting take?
Fitting an electric opening rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
What if my roof opening is the wrong size for the electric opening rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

