Guide prices in East Sussex
Small sealed unit
Misted or cracked unit up to about 1 m² measured, made and refitted
Medium sealed unit
Units up to about 2 m², or toughened and laminated
Large or specialist
Triple glazed, solar-control or heavy units needing lifting gear
Guide ranges. The first visit is charged and priced before booking; any new glass is priced in writing before work starts. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in East Sussex
Fitting across East Sussex means planning routes, access and lifting as well as the roof itself. Narrow lanes, shared driveways and town-centre parking restrictions all affect how a large unit is delivered and raised to roof level. We ask about these early so the quote reflects them. That approach is the same everywhere we work in England, from single domestic jobs to multi-unit commercial sites.
- Glass replacement in Bexhill-on-Sea
- Glass replacement in Brighton
- Glass replacement in Crowborough
- Glass replacement in Eastbourne
- Glass replacement in Hailsham
- Glass replacement in Hastings
- Glass replacement in Hove
- Glass replacement in Lewes
- Glass replacement in Peacehaven
- Glass replacement in Portslade
- Glass replacement in Rottingdean
- Glass replacement in Seaford
- Glass replacement in Uckfield
What we do on the day
- Frame rebate cleaned and checked for damage, corrosion or failed seals
- New unit set on packers, then beaded, capped or bonded as designed
- Old glass taken out safely and removed from site
- Matching the glass make-up — We identify the existing glass so the replacement performs at least as well.
- Condition of the frame — We look at the frame closely before committing to new glass.
Rules that apply in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Common questions in East Sussex
How long does new rooflight glass take?
The new sealed unit is made to the measured size, so there is a gap between the measuring visit and the fitting visit while it is produced. We give you the expected timing when we price the glass, and book the fitting once it has arrived.
Is the measuring visit charged?
Yes. The first visit measures the existing glass and checks the frame, and it is charged. We confirm that price before you book. The fitting of the new glass is then priced in writing, so you see the full cost before anything is ordered.
Can I upgrade the glass while it is being replaced?
Usually. Solar-control, self-cleaning, toughened or laminated glass can be specified as long as the frame can take the thickness and weight. We check that on the measuring visit and price the options side by side.

