Guide prices
About 1 × 2 m
Aluminium lantern, double glazed, fitted and glazed on a ready upstand
About 1.5 × 3 m
Mid-size lantern, solar-control glass options
2 × 4 m and over
Large lanterns, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Looking at a property near Windsor but not quite in it? We work across SL4, SL3 and SL1 and outwards to Slough, Egham and Staines. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Windsor.
Already bought your unit?
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What the job includes
- Glass cleaned and packaging cleared from the roof
- Roof membrane checked where it meets the lantern frame
- Upstand checked for size, level and square before the kit is opened
- Lanterns and planning — We check whether your lantern can go in without a planning application.
- Upstand size and tolerance — We check the kerb against the lantern maker's figures before the kit is opened.
How a fitting day runs
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A roof lantern goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one to two days.
Do you need permission in Windsor?
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
Before you get in touch
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in SL4, and we can price it.
Common questions in Windsor
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Do I need planning permission for a rooflight in Windsor?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Questions before you commit? Send them over with your Windsor postcode and we will answer them plainly, with a quote alongside.