Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Burntwood · WS7 · Staffordshire

Roof access hatch installation in Burntwood

Roof access hatch installation in Burntwood comes down to what happens around the glass. A good unit sat on a poor upstand, or with the membrane or flashing cut short at the corners, will still let water in. We fit each roof access hatch to the maker's instructions for fixings, packers and sealant, for homes and businesses across Burntwood and the rest of Staffordshire. That covers supply and fit, fit-only for a unit you already own, and swapping out a tired one. Every job starts with a written quote, so the price and scope are clear before anyone climbs a ladder.

Guide price from £1,795 · Supply & fit

What the job costs in Burntwood

Entry-level hatch

£1,795 – £2,995including VAT at 20%

Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand

Glazed manual hatch

£3,095 – £4,695including VAT at 20%

Double-glazed hinged hatch on gas struts, upstand and weathering

Electric glazed hatch

£9,345 – £12,595including VAT at 20%

Push-button glazed hatch with rain sensor; electrician's connection quoted separately

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering WS7 and neighbouring districts

Distance is rarely the deciding factor. A roof in Great Wyrley, 4 miles from Burntwood, gets the same survey, the same written quote and the same fitting process as one in WS7, WS12 and WS11. What changes the price is the job itself: size of unit, roof type, access and lifting. Lichfield, around 4 miles out, is treated the same way.

Fit-only or supply and fit

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a roof access hatch, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

On the day, we cover

  • Opening and upstand sized for a clear climb-through, not just daylight
  • Opening and closing tested and the controls explained
  • Locks, catches or handles checked from inside and out
  • Safety at the roof edge — We ask how often people will use the roof and for what.
  • How far the lid opens — We check how far the lid swings open and what it swings over.

How a fitting day runs

Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a roof access hatch is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Regulations for Burntwood properties

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Help us quote accurately

For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as WS7.

Common questions in Burntwood

Can you replace an old dome without redoing the whole roof?

Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.

What upstand height and roof pitch does roof access hatch fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

How long does fitting take?

Fitting a roof access hatch into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

For a free, no-obligation quote in Burntwood, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Access hatches in Burntwood

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote