What the job costs in Romsey
Entry-level hatch
Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand
Glazed manual hatch
Double-glazed hinged hatch on gas struts, upstand and weathering
Electric glazed hatch
Push-button glazed hatch with rain sensor; electrician's connection quoted separately
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Fitting across Romsey and nearby
If you also own a property or a business unit in Totton, Eastleigh or Southampton, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and SO51, SO52 and SO16 sit comfortably within that pattern.
Already bought your unit?
There are two ways to do this. Supply and fit means we source a roof access hatch that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.
What we do on the day
- Kerb checked or built square, level and to the maker's height
- Gas struts or actuator fitted and adjusted for full opening
- Opening and upstand sized for a clear climb-through, not just daylight
- Access hatch or smoke vent — We confirm the hatch is only for access and not part of a building's smoke ventilation.
- How far the lid opens — We check how far the lid swings open and what it swings over.
A typical installation day
Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a roof access hatch is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning, building control and Romsey
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
What to send for a quick quote
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, SO51 or a neighbouring district.
Common questions in Romsey
What upstand height and roof pitch does roof access hatch fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
How long does fitting take?
Fitting a roof access hatch into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Planning a roof access hatch in Romsey? Tell us about the roof and we will come back with a clear price in writing.