Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Atherton · M46 · Greater Manchester

Roof access hatch installation in Atherton

Our guide price for roof access hatch installation starts from £1,795, and the real figure for your roof in Atherton depends on a handful of things: the size and type of roof access hatch, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Greater Manchester.

Guide price from £1,795 · Supply & fit

What the job costs in Atherton

Entry-level hatch

£1,795 – £2,995including VAT at 20%

Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand

Glazed manual hatch

£3,095 – £4,695including VAT at 20%

Double-glazed hinged hatch on gas struts, upstand and weathering

Electric glazed hatch

£9,345 – £12,595including VAT at 20%

Push-button glazed hatch with rain sensor; electrician's connection quoted separately

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Distance is rarely the deciding factor. A roof in Tyldesley, 1 mile from Atherton, gets the same survey, the same written quote and the same fitting process as one in M46, M29 and BL5. What changes the price is the job itself: size of unit, roof type, access and lifting. Westhoughton, around 2 miles out, is treated the same way.

Fit-only or supply and fit

If you have bought a roof access hatch yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

What the job includes

  • Opening and closing tested and the controls explained
  • Locks, catches or handles checked from inside and out
  • Gas struts or actuator fitted and adjusted for full opening
  • Safety at the roof edge — We ask how often people will use the roof and for what.
  • Energy performance of hatches — We check the hatch's published U-value against the limit that applies.

From arrival to clean-up

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a roof access hatch: one day, weather permitting.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Details that speed up your quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around M46 and we will come back with a quote or a survey date.

Common questions in Atherton

What upstand height and roof pitch does roof access hatch fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

How long does fitting take?

Fitting a roof access hatch into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Get in touch with the details of your Atherton property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Access hatches in Atherton

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote