Guide prices in Islington
Entry-level hatch
Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand
Glazed manual hatch
Double-glazed hinged hatch on gas struts, upstand and weathering
Electric glazed hatch
Push-button glazed hatch with rain sensor; electrician's connection quoted separately
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
If you also own a property or a business unit in Highbury, Holloway or Camden Town, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and N1, EC1V and EC1R sit comfortably within that pattern.
Fit-only or supply and fit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
Included in the work
- Opening and closing tested and the controls explained
- Electric hatches wired ready for the electrician's final connection, quoted separately
- Kerb checked or built square, level and to the maker's height
- Access hatch or smoke vent — We confirm the hatch is only for access and not part of a building's smoke ventilation.
- Clear opening size — We check the hatch's clear opening rather than its outer size.
From arrival to clean-up
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a roof access hatch: one day, weather permitting.
Regulations for Islington properties
England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.
What to send for a quick quote
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around N1. That is enough for a first price.
Common questions in Islington
Can you fit the roof access hatch I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
What if my roof opening is the wrong size for the roof access hatch?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
How long does fitting take?
Fitting a roof access hatch into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Questions before you commit? Send them over with your Islington postcode and we will answer them plainly, with a quote alongside.