Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Highgate · N6 · Greater London

Roof access hatch installation in Highgate

Rooflight work is weather work. Membranes, primers and sealants all want a dry surface, so a fitting day in Highgate is planned around the forecast rather than pinned to a date regardless of rain. The opening is kept covered whenever it is exposed, and a roof is not left open overnight without a proper temporary seal. That approach applies to every roof access hatch we install, from a new opening to a straight swap or a fit-only job. We cover Highgate, the N6 district and the rest of Greater London.

Guide price from £1,795 · Supply & fit

Guide prices in Highgate

Entry-level hatch

£1,795 – £2,995including VAT at 20%

Polycarbonate or entry-level hinged hatch on gas struts, fitted to a new or existing upstand

Glazed manual hatch

£3,095 – £4,695including VAT at 20%

Double-glazed hinged hatch on gas struts, upstand and weathering

Electric glazed hatch

£9,345 – £12,595including VAT at 20%

Push-button glazed hatch with rain sensor; electrician's connection quoted separately

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Coverage in and around Highgate

Our fitters come to you. For Highgate that covers N6, N19 and NW5, plus nearby Archway and Muswell Hill. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

Fit-only or supply and fit

Your unit or ours, the fitting standard is the same. For supply and fit we choose a roof access hatch to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.

Included in the work

  • Gas struts or actuator fitted and adjusted for full opening
  • Opening and closing tested and the controls explained
  • Hatch fixed and weathered, with the membrane dressed up the upstand
  • Energy performance of hatches — We check the hatch's published U-value against the limit that applies.
  • Clear opening size — We check the hatch's clear opening rather than its outer size.

Fitting your roof access hatch, step by step

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a roof access hatch level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.

Planning and building rules in England

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Details that speed up your quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, N6 or nearby, confirms travel.

Common questions in Highgate

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Ask for a quote for your Highgate roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Access hatches in Highgate

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote