Our guide price for frameless rooflight installation starts from £1,445, and the real figure for your roof in Highgate depends on a handful of things: the size and type of frameless rooflight, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Greater London.

Guide price from £1,445 · Supply & fit

Guide prices

Small frameless

£1,445 – £2,145including VAT at 20%

Up to about 1000 × 1000 mm, hidden frame inside the upstand

Medium frameless

£2,145 – £3,345including VAT at 20%

Up to about 1000 × 2000 mm

Large frameless

£3,345 – £5,395including VAT at 20%

Large single panes, lifting gear on the day

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Jobs across N6, N19 and NW5 are part of our normal cover for Highgate. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Archway and Muswell Hill are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.

Your frameless rooflights or ours

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

What the job includes

  • Upstand built to the maker's drawing within its stated tolerance
  • Fall set in the upstand so rain clears the oversailing glass edge
  • Glass bedded on the specified tape or sealant and fixed through the concealed frame
  • Tolerance on the upstand — We build frameless kerbs to the maker's tolerance rather than to normal carpentry accuracy.
  • How the reveal will look — We agree the finish at the glass edge before building anything.

How a fitting day runs

Where a job takes one day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a frameless rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Do you need permission in Highgate?

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Details that speed up your quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around N6 and we will come back with a quote or a survey date.

Common questions in Highgate

How long does fitting take?

Fitting a frameless rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What upstand height and roof pitch does frameless rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Planning a frameless rooflight in Highgate? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Frameless rooflights in Highgate

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote