What the job costs in Deeside
Small frameless
Up to about 1000 × 1000 mm, hidden frame inside the upstand
Medium frameless
Up to about 1000 × 2000 mm
Large frameless
Large single panes, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Distance is rarely the deciding factor. A roof in Hawarden, 1 mile from Deeside, gets the same survey, the same written quote and the same fitting process as one in CH5, CH7 and CH4. What changes the price is the job itself: size of unit, roof type, access and lifting. Buckley, around 3 miles out, is treated the same way.
Fit-only or supply and fit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What the job includes
- Upstand built to the maker's drawing within its stated tolerance
- Inside reveal formed so plaster or trim meets the glass cleanly
- Fall set in the upstand so rain clears the oversailing glass edge
- How the reveal will look — We agree the finish at the glass edge before building anything.
- Laminated inner pane — We confirm the inner pane is laminated or otherwise suited to being overhead.
A typical installation day
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A frameless rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take one day.
Planning, building control and Deeside
In Wales, a new rooflight opening generally needs building regulations approval, and a replacement needs either a scheme-registered installer's certificate or a building notice to the council. We are not registered with a scheme, so we use a building notice and show the fee on the quote. Rooflights must meet 2.2 W/m²K and roof windows 1.4 W/m²K. Planning is tighter than in England: rooflights are not permitted development in conservation areas, National Parks, Areas of Outstanding Natural Beauty or World Heritage Sites, so we check your address before quoting.
Getting a price from photos
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, CH5 or a neighbouring district.
Common questions in Deeside
Will my new frameless rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
How long does fitting take?
Fitting a frameless rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Planning a frameless rooflight in Deeside? Tell us about the roof and we will come back with a clear price in writing.

