Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Reading · RG1 · Berkshire

Frameless rooflight installation in Reading

A rooflight is not finished when the roof is watertight. The inside matters too: the reveal or lining around the opening, the plaster, the trim where it meets the ceiling. Some installers leave that for somebody else. When we quote for frameless rooflight installation in Reading, internal finishing is listed so you can see whether it is included or left for your decorator. That way a frameless rooflight looks right from the room below as well as from outside. We cover Reading and properties throughout Berkshire.

Guide price from £1,445 · Supply & fit

Reading guide prices

Small frameless

£1,445 – £2,145including VAT at 20%

Up to about 1000 × 1000 mm, hidden frame inside the upstand

Medium frameless

£2,145 – £3,345including VAT at 20%

Up to about 1000 × 2000 mm

Large frameless

£3,345 – £5,395including VAT at 20%

Large single panes, lifting gear on the day

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering RG1 and neighbouring districts

Fitters travel to the job, so the address is what counts. In Reading that means postcode districts RG1, RG4 and RG30, and the same teams can just as easily take on work in Lower Earley, about 3 miles away, or Wokingham at roughly 7 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

What we check on a supplied unit

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a frameless rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

On the day, we cover

  • Roof covering turned up and finished under the glass overhang
  • Fall set in the upstand so rain clears the oversailing glass edge
  • Lifting gear arranged for heavy single panes where two people cannot safely carry
  • Glass weight and access — We plan the lift for a frameless pane before the delivery is booked.
  • Tolerance on the upstand — We build frameless kerbs to the maker's tolerance rather than to normal carpentry accuracy.

From arrival to clean-up

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a frameless rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day.

Planning and building rules in England

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Before you get in touch

Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around RG1. That is enough for a first price.

Common questions in Reading

How long does fitting take?

Fitting a frameless rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

Can you fit a rooflight in winter or when it is raining?

Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

What if my roof opening is the wrong size for the frameless rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Questions before you commit? Send them over with your Reading postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Frameless rooflights in Reading

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote