Guide prices
Small frameless
Up to about 1000 × 1000 mm, hidden frame inside the upstand
Medium frameless
Up to about 1000 × 2000 mm
Large frameless
Large single panes, lifting gear on the day
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering MK45 and neighbouring districts
If you also own a property or a business unit in Kempston, Bedford or Dunstable, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and MK45, MK42 and MK43 sit comfortably within that pattern.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a frameless rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Inside reveal formed so plaster or trim meets the glass cleanly
- Roof covering turned up and finished under the glass overhang
- Upstand built to the maker's drawing within its stated tolerance
- Drainage at the overhang — We check how water leaves the glass where it oversails the kerb.
- Tolerance on the upstand — We build frameless kerbs to the maker's tolerance rather than to normal carpentry accuracy.
How a fitting day runs
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a frameless rooflight: one day, weather permitting.
Regulations for Ampthill properties
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
What to send for a quick quote
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, MK45 or a neighbouring district.
Common questions in Ampthill
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
How long does fitting take?
Fitting a frameless rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do I need planning permission for a rooflight in Ampthill?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Questions before you commit? Send them over with your Ampthill postcode and we will answer them plainly, with a quote alongside.