What the job costs in Merthyr Tydfil
Small conservation unit
Low-profile unit with glazing bar, slate or tile flashing
Medium unit
Larger opening, lead or matching flashings
Large or bespoke
Larger or made-to-order units for listed or sensitive roofs
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Jobs across CF47, CF48 and CF44 are part of our normal cover for Merthyr Tydfil. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Aberdare and Rhondda are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
Fit-only or supply and fit
If you have bought a conservation rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the flashing kit and the roof pitch range. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
On the day, we cover
- Slates or tiles lifted carefully and kept for reuse where possible
- Slates or tiles made good around the frame with tidy cuts
- Rafters trimmed with timbers that suit the existing roof
- Conservation area rules by nation — We check the permitted development position for your nation before the rooflight is ordered.
- Energy and old roofs — We make sure the rooflight meets current energy rules while suiting an older roof build-up.
Fitting your conservation rooflight, step by step
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a conservation rooflight: one day, weather permitting.
Planning, building control and Merthyr Tydfil
For a Welsh home, start with where the house is. In a conservation area, National Park, AONB or World Heritage Site, a rooflight needs planning permission; outside those, permitted development usually covers one that projects 150 mm or less. Side-facing roof windows within 10.5 m of a boundary must be obscure-glazed and fixed. New openings need building regulations approval, and replacements we fit are notified with a building notice, as we are not registered with a competent person scheme. We confirm all of this for your address.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CF47 or nearby, confirms travel.
Common questions in Merthyr Tydfil
How long does fitting take?
Fitting a conservation rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you cover Merthyr Tydfil?
Yes. Fitters travel to addresses in Merthyr Tydfil and the surrounding districts, including CF47. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Questions before you commit? Send them over with your Merthyr Tydfil postcode and we will answer them plainly, with a quote alongside.

