Guide prices in Norbury
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
Our fitters come to you. For Norbury that covers SW16, SE27 and SE19, plus nearby Upper Norwood and Streatham. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
What the job includes
- Phasing agreed so occupied areas stay dry and usable
- Kerbs checked and packed, adapted or rebuilt where needed
- Old units removed, with waste taken off site
- Energy limits for non-domestic roofs — We check new units against the energy limits for non-domestic buildings.
- Glass or polycarbonate — We compare glass and polycarbonate units against the roof, use and budget.
From arrival to clean-up
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a commercial rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes about a day per unit, longer on big roofs.
Planning, building control and Norbury
On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, SW16 or nearby, confirms travel.
Common questions in Norbury
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
How long does fitting take?
Fitting a commercial rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
Ask for a quote for your Norbury roof. Survey dates are offered based on fitter availability once you are happy with the price.

