Guide prices
Per standard unit
Flat glass or polycarbonate unit on an existing kerb, as part of a multi-unit job
Per large unit
Larger or ventilating units, edge protection in place
Programme of works
Phased replacement across a building, priced from a survey
Guide ranges for supply & fit, per unit; site set-up priced separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Carlisle we cover
Covering Carlisle means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in CA3, CA2 and CA1, and are happy to quote further out in Penrith and Workington. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
What the job includes
- Old units removed, with waste taken off site
- Unit schedule and handover notes for the building's records
- Kerbs checked and packed, adapted or rebuilt where needed
- Fire performance near boundaries — We check how close the rooflights are to the site boundary and to escape routes.
- Working around occupied buildings — We plan noise, dust and access around the people using the building.
What happens on the day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a commercial rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes about a day per unit, longer on big roofs.
Do you need permission in Carlisle?
On commercial buildings in England, new rooflights and changes to roof structure go through building control, and replacements in non-dwellings also need building control involvement unless fitted by a scheme-registered installer, which we are not; load-bearing or structural glass always goes through building control. Fire rules matter near boundaries and over escape routes, and smoke vents must be certified to BS EN 12101-2. We confirm the route and the paperwork for your building before work starts.
Getting a price from photos
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CA3 or nearby, confirms travel.
Common questions in Carlisle
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Ask for a quote for your Carlisle roof. Survey dates are offered based on fitter availability once you are happy with the price.

