What the job costs in Craigavon
Up to 1 m²
Laminated walk-on unit with anti-slip finish, fitted level with the terrace
Up to 2 m²
Larger walk-on glazing
Large or bespoke
Big panes, structural calculations, lifting gear
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Craigavon
Craigavon and the districts around it, BT64, BT65 and BT66, all sit inside our working area. So does the ground between Craigavon and Portadown (3 miles), and on towards Banbridge (8 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Buying your own, or letting us supply
Your unit or ours, the fitting standard is the same. For supply and fit we choose a walk-on rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Support frame or upstand prepared to the approved structural design
- Lifting plan for the unit, including people or gear for the day
- Protective film removed and the anti-slip surface left clean
- Non-fragile is not walk-on — We make sure the unit is genuinely designed for foot traffic.
- Weight on delivery day — We plan the delivery and lift before booking any lifting gear or extra hands.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a walk-on rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Regulations for Craigavon properties
Northern Ireland's building regulations set a minimum of WER Band C or 1.6 W/m²K for rooflights and roof windows in existing homes, assessed under Technical Booklet F1. New openings involve trimming the roof structure, so expect a building control application. Many house rooflights don't need planning permission, but conservation areas and listed buildings are excluded, and side windows near a boundary have obscure-glazing rules. We confirm what applies.
Getting a price from photos
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, BT64 or nearby, confirms travel.
Common questions in Craigavon
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Can you fit a rooflight in winter or when it is raining?
Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.
Tell us your postcode, BT64 or close by, and what you want fitted. We will reply with the next steps and a quote.