Replacing an old dome or a failed rooflight often means the kerb underneath has to change too: it may be rotten, too low for the new unit or the wrong size. We strip back what is needed, build a new upstand in Cleckheaton to the new unit's dimensions, insulate it and dress the roof covering up to it. Where only part of the kerb has failed, we say so and price the smaller repair. The scope is set out in a written quote before work starts.

Guide price from £245 · Labour and materials, rooflight not included

What the job costs in Cleckheaton

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering BD19 and neighbouring districts

Distance is rarely the deciding factor. A roof in Liversedge, 2 miles from Cleckheaton, gets the same survey, the same written quote and the same fitting process as one in BD19, WF15 and WF16. What changes the price is the job itself: size of unit, roof type, access and lifting. Heckmondwike, around 2 miles out, is treated the same way.

What the job includes

  • Diagonals measured so the kerb is square before anything sits on it
  • Height set above the finished roof to the maker's stated minimum
  • Insulation fitted to the upstand faces to limit heat loss
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.
  • Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.

How a fitting day runs

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Planning, building control and Cleckheaton

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, BD19 or nearby, confirms travel.

Common questions in Cleckheaton

Can you fit a rooflight in winter or when it is raining?

Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Get in touch with the details of your Cleckheaton property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Cleckheaton

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote