Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Nuneaton · CV11 · Warwickshire

Rooflight upstands & kerbs in Nuneaton

An upstand is the timber kerb a flat-roof rooflight sits on, and most fitting problems start there. Each maker sets the kerb size, the minimum height above the finished roof and whether the kerb should be level or built to a fall. We build upstands in Nuneaton to those figures for the rooflight you have chosen, insulate the faces that need it and dress the roof membrane up and over so the kerb is weathertight. Every job is quoted in writing first.

Guide price from £245 · Labour and materials, rooflight not included

What the job costs in Nuneaton

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering CV11 and neighbouring districts

Covering Nuneaton means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in CV11, CV10 and CV12, and are happy to quote further out in Bedworth and Hinckley. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.

Included in the work

  • Roof membrane turned up, bonded and finished at the kerb top
  • Height set above the finished roof to the maker's stated minimum
  • Treated timber frame fixed down to the deck and joists
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.
  • Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.

A typical installation day

On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.

Planning, building control and Nuneaton

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CV11 and we will come back with a quote or a survey date.

Common questions in Nuneaton

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Get in touch with the details of your Nuneaton property and we will explain what the job involves and what it costs.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Nuneaton

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote