Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Ashington · NE63 · Northumberland

Rooflight upstands & kerbs in Ashington

Building an upstand in Ashington starts with the rooflight's own drawing, not a standard size. The kerb has to match the unit's internal dimensions, stand high enough above the finished roof for water to run off, and be level or pitched as the maker asks. We set the timber out to those figures, check the diagonals, insulate and weather it. If the rooflight is not on site yet, send us its make and model so the kerb is built for it.

Guide price from £245 · Labour and materials, rooflight not included

Ashington guide prices

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Ashington and nearby

Ashington and the districts around it, NE63, NE62 and NE64, all sit inside our working area. So does the ground between Ashington and Bedlington (3 miles), and on towards Blyth (4 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Included in the work

  • Fall built into the kerb where the rooflight needs one
  • Roof membrane turned up, bonded and finished at the kerb top
  • Kerb sized from the maker's drawing, internal and external dimensions both checked
  • Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
  • Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.

How a fitting day runs

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

What to send for a quick quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, NE63 or nearby, confirms travel.

Common questions in Ashington

Do you cover Ashington?

Yes. Fitters travel to addresses in Ashington and the surrounding districts, including NE63. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.

Do I need planning permission for a rooflight in Ashington?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

For a free, no-obligation quote in Ashington, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Ashington

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote