Guide prices
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering TS1 and neighbouring districts
Middlesbrough and the districts around it, TS1, TS2 and TS4, all sit inside our working area. So does the ground between Middlesbrough and Billingham (2 miles), and on towards Stockton-on-Tees (3 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
On the day, we cover
- Diagonals measured so the kerb is square before anything sits on it
- Kerb sized from the maker's drawing, internal and external dimensions both checked
- Roof membrane turned up, bonded and finished at the kerb top
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
- Size tolerance on the kerb — We build kerbs to a tight tolerance because rooflight glass is made to order and cannot be trimmed on site.
How a fitting day runs
On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.
Planning, building control and Middlesbrough
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Before you get in touch
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around TS1 and we will come back with a quote or a survey date.
Common questions in Middlesbrough
Do I need planning permission for a rooflight in Middlesbrough?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Get in touch with the details of your Middlesbrough property and we will explain what the job involves and what it costs.

