What the job costs in Pontypridd
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Pontypridd
If you also own a property or a business unit in Tonypandy, Caerphilly or Gelligaer, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and CF37, CF38 and CF39 sit comfortably within that pattern.
What the job includes
- Roof membrane turned up, bonded and finished at the kerb top
- Height set above the finished roof to the maker's stated minimum
- Fall built into the kerb where the rooflight needs one
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
- Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
Fitting your rooflight upstand, step by step
On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.
Do you need permission in Pontypridd?
Wales sets energy limits of 2.2 W/m²K for rooflights and 1.4 W/m²K for roof windows, and new rooflight openings generally need building regulations approval. Replacement units are controlled fittings; we are not registered with a competent person scheme, so ours are covered by a building notice to the council. Planning permission is needed for rooflights in conservation areas, National Parks, AONBs and World Heritage Sites. We check which applies and include the fee in your quote.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CF37 and we will come back with a quote or a survey date.
Common questions in Pontypridd
Does a rooflight need building regulations approval?
In Wales a new opening generally needs building regulations approval. A replacement must be self-certified by a scheme-registered installer or covered by a building notice. We are not registered with a scheme, so replacements we fit go through a building notice, and the council's fee is shown on your quote.
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Ask for a quote for your Pontypridd roof. Survey dates are offered based on fitter availability once you are happy with the price.