Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Strood · ME2 · Kent

Rooflight upstands & kerbs in Strood

Building an upstand in Strood starts with the rooflight's own drawing, not a standard size. The kerb has to match the unit's internal dimensions, stand high enough above the finished roof for water to run off, and be level or pitched as the maker asks. We set the timber out to those figures, check the diagonals, insulate and weather it. If the rooflight is not on site yet, send us its make and model so the kerb is built for it.

Guide price from £245 · Labour and materials, rooflight not included

Guide prices

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Strood and nearby

Fitters travel to the job, so the address is what counts. In Strood that means postcode districts ME2, ME1 and ME4, and the same teams can just as easily take on work in Rochester, about 1 mile away, or Chatham at roughly 2 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

What the job includes

  • Insulation fitted to the upstand faces to limit heat loss
  • Diagonals measured so the kerb is square before anything sits on it
  • Treated timber frame fixed down to the deck and joists
  • Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.

From arrival to clean-up

Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.

Planning, building control and Strood

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Details that speed up your quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around ME2 and we will come back with a quote or a survey date.

Common questions in Strood

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Do you cover Strood?

Yes. Fitters travel to addresses in Strood and the surrounding districts, including ME2. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

For a free, no-obligation quote in Strood, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Strood

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote