Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Tadley · RG26 · Hampshire

Rooflight upstands & kerbs in Tadley

A kerb that is a few millimetres out of square, or a little too low once the roof covering goes on, can stop a rooflight sealing properly. That is why upstand work in Tadley starts with measuring the opening, the roof build-up and the unit's kerb size together. The upstand is then built from treated timber, insulated and weathered into the membrane, felt or fibreglass. You get a written quote first and a note of the sizes it was built to.

Guide price from £245 · Labour and materials, rooflight not included

What the job costs in Tadley

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Tadley and nearby

If you also own a property or a business unit in Basingstoke, Thatcham or Newbury, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and RG26, RG24 and RG21 sit comfortably within that pattern.

What the job includes

  • Roof membrane turned up, bonded and finished at the kerb top
  • Insulation fitted to the upstand faces to limit heat loss
  • Treated timber frame fixed down to the deck and joists
  • Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
  • Size tolerance on the kerb — We build kerbs to a tight tolerance because rooflight glass is made to order and cannot be trimmed on site.

How a fitting day runs

On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.

Do you need permission in Tadley?

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Help us quote accurately

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, RG26 or nearby, confirms travel.

Common questions in Tadley

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Do I need planning permission for a rooflight in Tadley?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Ask for a quote for your Tadley roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Tadley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote