Guide prices
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Romford we cover
Romford and the districts around it, RM1, RM7 and RM2, all sit inside our working area. So does the ground between Romford and Hornchurch (2 miles), and on towards Dagenham (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Included in the work
- Roof membrane turned up, bonded and finished at the kerb top
- Height set above the finished roof to the maker's stated minimum
- Fall built into the kerb where the rooflight needs one
- Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
How a fitting day runs
Building an upstand starts with the rooflight's own drawing: its kerb size, height above the finished roof and fall. The team sets the timber out to those figures, checks the diagonals, insulates the outer faces and dresses the membrane up and over. If the rooflight is going on the same day, it is fitted next; if not, the kerb is protected until it does.
Do you need permission in Romford?
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Details that speed up your quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around RM1 and we will come back with a quote or a survey date.
Common questions in Romford
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Questions before you commit? Send them over with your Romford postcode and we will answer them plainly, with a quote alongside.

