Guide prices in Glasgow & Dunbartonshire
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Towns we list in Glasgow & Dunbartonshire
Coverage in Glasgow & Dunbartonshire works by postcode, not by distance from an office. Give us the full postcode and we will confirm whether it is standard cover, as it is for most of Scotland, or one of the few remote and island areas handled by arrangement. Either way, you get a written quote before any work is booked, with travel included in the price.
- Upstands & kerbs in Bearsden
- Upstands & kerbs in Bishopbriggs
- Upstands & kerbs in Clydebank
- Upstands & kerbs in Dumbarton
- Upstands & kerbs in Glasgow
- Upstands & kerbs in Kirkintilloch
- Upstands & kerbs in Vale of Leven
Included in the work
- Insulation fitted to the upstand faces to limit heat loss
- Diagonals measured so the kerb is square before anything sits on it
- Roof membrane turned up, bonded and finished at the kerb top
- Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.
- Energy limit for site-built kerbs — We insulate the kerb to what the building standards in Scotland expect; England and Wales set 0.35 W/m²K for site-built upstands.
Rules that apply in Scotland
If you live in Scotland, the key question is whether the job is new or a replacement. A new rooflight needs a building warrant. Swapping an old rooflight for a new one, frame included, doesn't, as long as the new unit meets the standards: the energy figure for new or replacement rooflights in alterations is 1.6 W/m²K. Conservation areas have no householder permitted development rights for roof alterations, and listed buildings need listed building consent.
Common questions in Glasgow & Dunbartonshire
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
Do I need planning permission for a rooflight in Glasgow & Dunbartonshire?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in Scotland. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

