Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Maldon · CM9 · Essex

Rooflight upstands & kerbs in Maldon

A kerb that is a few millimetres out of square, or a little too low once the roof covering goes on, can stop a rooflight sealing properly. That is why upstand work in Maldon starts with measuring the opening, the roof build-up and the unit's kerb size together. The upstand is then built from treated timber, insulated and weathered into the membrane, felt or fibreglass. You get a written quote first and a note of the sizes it was built to.

Guide price from £245 · Labour and materials, rooflight not included

Guide prices in Maldon

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Maldon and nearby

Fitters travel to the job, so the address is what counts. In Maldon that means postcode districts CM9, CM3 and CM8, and the same teams can just as easily take on work in Witham, about 5 miles away, or Chelmsford at roughly 9 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.

Included in the work

  • Diagonals measured so the kerb is square before anything sits on it
  • Treated timber frame fixed down to the deck and joists
  • Fall built into the kerb where the rooflight needs one
  • Energy limit for site-built kerbs — We insulate upstands to meet the limit for site-built upstands, which is 0.35 W/m²K in England and Wales.
  • Fall built in or level — We confirm whether your rooflight needs the kerb to provide a fall or should sit level.

Fitting your rooflight upstand, step by step

On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.

Planning, building control and Maldon

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Help us quote accurately

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around CM9 and we will come back with a quote or a survey date.

Common questions in Maldon

Do you cover Maldon?

Yes. Fitters travel to addresses in Maldon and the surrounding districts, including CM9. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Send a few photos and your CM9 postcode, and we will put together a written quote for the job.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Maldon

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote