A kerb that is a few millimetres out of square, or a little too low once the roof covering goes on, can stop a rooflight sealing properly. That is why upstand work in Saltash starts with measuring the opening, the roof build-up and the unit's kerb size together. The upstand is then built from treated timber, insulated and weathered into the membrane, felt or fibreglass. You get a written quote first and a note of the sizes it was built to.

Guide price from £245 · Labour and materials, rooflight not included

What the job costs in Saltash

Timber upstand

£245 – £445including VAT at 20%

Treated timber kerb built square and level to the maker's size

Insulated upstand

£445 – £845including VAT at 20%

Kerb with insulation and the roof membrane turned up and dressed

Large or with trimming

£845 – £1,445including VAT at 20%

Bigger kerbs or where joists need trimming first

Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

If you also own a property or a business unit in Plymouth, Plymstock or Bodmin, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and PL12, PL11 and PL10 sit comfortably within that pattern.

Included in the work

  • Treated timber frame fixed down to the deck and joists
  • Kerb sized from the maker's drawing, internal and external dimensions both checked
  • Height set above the finished roof to the maker's stated minimum
  • Size tolerance on the kerb — We build kerbs to a tight tolerance because rooflight glass is made to order and cannot be trimmed on site.
  • Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.

A typical installation day

On the day, the fitters check the opening and the roof deck around it, then cut and fix treated timber to the maker's kerb size, square and level, with any fall the rooflight needs built in. Insulation goes on the faces that need it, and the roof membrane is turned up and dressed so the kerb is weathertight before anyone leaves. Most upstand jobs take half a day to a day.

Planning and building rules in England

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

What to send for a quick quote

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around PL12 and we will come back with a quote or a survey date.

Common questions in Saltash

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Do I need planning permission for a rooflight in Saltash?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

For a free, no-obligation quote in Saltash, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Upstands & kerbs in Saltash

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote