Guide prices in Milton Keynes
Timber upstand
Treated timber kerb built square and level to the maker's size
Insulated upstand
Kerb with insulation and the roof membrane turned up and dressed
Large or with trimming
Bigger kerbs or where joists need trimming first
Guide ranges for labour and materials, rooflight not included. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Distance is rarely the deciding factor. A roof in Newport Pagnell, 3 miles from Milton Keynes, gets the same survey, the same written quote and the same fitting process as one in MK9, MK6 and MK14. What changes the price is the job itself: size of unit, roof type, access and lifting. Bletchley, around 3 miles out, is treated the same way.
What the job includes
- Height set above the finished roof to the maker's stated minimum
- Diagonals measured so the kerb is square before anything sits on it
- Insulation fitted to the upstand faces to limit heat loss
- Height above the finished roof — We set the upstand so it stands at least 150 mm above the finished roof, measured from the top of any ballast, paving or walkway.
- Roof covering compatibility — We check what the roof is covered in before choosing how the membrane meets the kerb.
How a fitting day runs
The fitters measure twice before cutting: the opening, the rooflight's kerb size and the finished roof level. The kerb is built, packed level or to the maker's fall, insulated and weathered into the roof covering. You are left with an upstand ready for the rooflight, and a note of the sizes it was built to.
Planning, building control and Milton Keynes
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Getting a price from photos
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, MK9 or nearby, confirms travel.
Common questions in Milton Keynes
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
Ask for a quote for your Milton Keynes roof. Survey dates are offered based on fitter availability once you are happy with the price.

