Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Hawick · TD9 · Scottish Borders

Sun tunnel installation in Hawick

Sun tunnel installation in Hawick comes down to what happens around the glass. A good unit sat on a poor upstand, or with the membrane or flashing cut short at the corners, will still let water in. We fit each sun tunnel to the maker's instructions for fixings, packers and sealant, for homes and businesses across Hawick and the rest of Scottish Borders. That covers supply and fit, fit-only for a unit you already own, and swapping out a tired one. Every job starts with a written quote, so the price and scope are clear before anyone climbs a ladder.

Guide price from £595 · Supply & fit

Guide prices in Hawick

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.

Covering TD9 and neighbouring districts

Distance is rarely the deciding factor. A roof in Galashiels, 14 miles from Hawick, gets the same survey, the same written quote and the same fitting process as one in TD9, TD7 and TD8. What changes the price is the job itself: size of unit, roof type, access and lifting. Penicuik, around 33 miles out, is treated the same way.

Fit-only or supply and fit

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

What the job includes

  • Dome fixed and sealed on top of the flashing
  • Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
  • Rigid or flexible tube run and joined, with as few bends as possible
  • Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.
  • Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.

From arrival to clean-up

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a sun tunnel runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Regulations for Hawick properties

For Scottish homes: building warrant for new rooflight openings; no warrant for replacing a rooflight complete with its frame, provided it meets the standards, including 1.6 W/m²K; planning permission in conservation areas and listed building consent for listed properties. Outside those, permitted development usually covers house rooflights, but the planning authority has the final word, so we check before you commit.

Before you get in touch

A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, TD9 or a neighbouring district.

Common questions in Hawick

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

How long does fitting take?

Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Ask for a quote for your Hawick roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sun tunnels in Hawick

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote