Guide prices in Hawick
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Covering TD9 and neighbouring districts
Distance is rarely the deciding factor. A roof in Galashiels, 14 miles from Hawick, gets the same survey, the same written quote and the same fitting process as one in TD9, TD7 and TD8. What changes the price is the job itself: size of unit, roof type, access and lifting. Penicuik, around 33 miles out, is treated the same way.
Fit-only or supply and fit
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a sun tunnel, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the opening size and the flashing kit it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
What the job includes
- Dome fixed and sealed on top of the flashing
- Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
- Rigid or flexible tube run and joined, with as few bends as possible
- Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.
- Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.
From arrival to clean-up
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a sun tunnel runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Regulations for Hawick properties
For Scottish homes: building warrant for new rooflight openings; no warrant for replacing a rooflight complete with its frame, provided it meets the standards, including 1.6 W/m²K; planning permission in conservation areas and listed building consent for listed properties. Outside those, permitted development usually covers house rooflights, but the planning authority has the final word, so we check before you commit.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, TD9 or a neighbouring district.
Common questions in Hawick
How does payment work?
Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.
How long does fitting take?
Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Ask for a quote for your Hawick roof. Survey dates are offered based on fitter availability once you are happy with the price.

