Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Cowley · OX4 · Oxfordshire

Sun tunnel installation in Cowley

A rooflight is not finished when the roof is watertight. The inside matters too: the reveal or lining around the opening, the plaster, the trim where it meets the ceiling. Some installers leave that for somebody else. When we quote for sun tunnel installation in Cowley, internal finishing is listed so you can see whether it is included or left for your decorator. That way a sun tunnel looks right from the room below as well as from outside. We cover Cowley and properties throughout Oxfordshire.

Guide price from £595 · Supply & fit

What the job costs in Cowley

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Cowley and nearby

Jobs across OX4, OX3 and OX1 are part of our normal cover for Cowley. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Oxford and Abingdon are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.

Already bought your unit?

There are two ways to do this. Supply and fit means we source a sun tunnel that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.

What we do on the day

  • Tube insulated where it passes through a cold loft
  • Dust cleared from the room below and the loft
  • Route through the loft checked for joists, cables and pipes
  • Tube size — We match the tube size to the room and the roof.
  • Length and bends in the tube — We plan the shortest, straightest route we can between the roof and the ceiling.

How a fitting day runs

Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a sun tunnel runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Details that speed up your quote

Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in OX4, and we can price it.

Common questions in Cowley

Will my new sun tunnel leak?

A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Ask for a quote for your Cowley roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sun tunnels in Cowley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote