Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Maidstone · ME16 · Kent

Sun tunnel installation in Maidstone

Our guide price for sun tunnel installation starts from £595, and the real figure for your roof in Maidstone depends on a handful of things: the size and type of sun tunnel, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Kent.

Guide price from £595 · Supply & fit

Guide prices

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Areas around Maidstone we cover

Looking at a property near Maidstone but not quite in it? We work across ME16, ME15 and ME14 and outwards to Chatham, Rochester and Gillingham. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Maidstone.

What we check on a supplied unit

Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a sun tunnel on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.

What we do on the day

  • Dust cleared from the room below and the loft
  • Dome fixed and sealed on top of the flashing
  • Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
  • Length and bends in the tube — We plan the shortest, straightest route we can between the roof and the ceiling.
  • Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.

A typical installation day

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sun tunnel level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes half a day to a day.

Regulations for Maidstone properties

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Help us quote accurately

Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around ME16. That is enough for a first price.

Common questions in Maidstone

Can you fit a rooflight in winter or when it is raining?

Yes, within limits. Cold is less of a problem than wet, because membranes, primers and sealants need a dry surface to bond. We plan fitting days around the forecast and may move a date if heavy rain is due. If the roof has to be opened up, it is not left overnight without a temporary weather seal, so the room below stays dry while the work is finished.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Planning a sun tunnel in Maidstone? Tell us about the roof and we will come back with a clear price in writing.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sun tunnels in Maidstone

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote