Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Wimborne Minster · BH18 · Dorset

Sun tunnel installation in Wimborne Minster

Our guide price for sun tunnel installation starts from £595, and the real figure for your roof in Wimborne Minster depends on a handful of things: the size and type of sun tunnel, whether the opening exists already, the roof covering, and how easy access is. We fix the price in a written quote before work begins. Nothing gets added on the day without your say-so. For a rough idea first, photos and a couple of measurements are enough to go on, and we cover all of Dorset.

Guide price from £595 · Supply & fit

What the job costs in Wimborne Minster

Short rigid tube

£595 – £845including VAT at 20%

Around 250 mm tube, short straight run through a loft

Wider or longer run

£845 – £1,145including VAT at 20%

Around 350 mm tube or longer runs with bends

Flat roof or complex

£1,145 – £1,745including VAT at 20%

Flat roof kits, long runs or two tubes

Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Is your address covered?

Our fitters come to you. For Wimborne Minster that covers BH18, BH21 and BH17, plus nearby Ferndown and Poole. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.

What we check on a supplied unit

Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.

What the job includes

  • Dust cleared from the room below and the loft
  • Route through the loft checked for joists, cables and pipes
  • Ceiling opening cut neatly and the diffuser fitted
  • Length and bends in the tube — We plan the shortest, straightest route we can between the roof and the ceiling.
  • Rigid or flexible tube — We check whether a rigid tube will fit the route before falling back on a flexible one.

What happens on the day

Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a sun tunnel level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes half a day to a day.

Regulations for Wimborne Minster properties

Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.

Before you get in touch

What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around BH18 and we will come back with a quote or a survey date.

Common questions in Wimborne Minster

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Do I need planning permission for a rooflight in Wimborne Minster?

Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.

Do you need scaffolding to fit a rooflight?

Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.

Questions before you commit? Send them over with your Wimborne Minster postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Sun tunnels in Wimborne Minster

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote