Guide prices
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Penrith and the districts around it, CA11, CA10 and CA16, all sit inside our working area. So does the ground between Penrith and Carlisle (17 miles), and on towards Kendal (23 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Already bought your unit?
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
Included in the work
- Dust cleared from the room below and the loft
- Dome fixed and sealed on top of the flashing
- Route through the loft checked for joists, cables and pipes
- Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.
- Condensation in cold lofts — We insulate the tube where it passes through a cold loft.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a sun tunnel, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Regulations for Penrith properties
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Details that speed up your quote
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in CA11, and we can price it.
Common questions in Penrith
Do I need planning permission for a rooflight in Penrith?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Do you cover Penrith?
Yes. Fitters travel to addresses in Penrith and the surrounding districts, including CA11. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
How long does fitting take?
Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Get in touch with the details of your Penrith property and we will explain what the job involves and what it costs.