Guide prices in Buckinghamshire
Short rigid tube
Around 250 mm tube, short straight run through a loft
Wider or longer run
Around 350 mm tube or longer runs with bends
Flat roof or complex
Flat roof kits, long runs or two tubes
Guide ranges for supply & fit. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Buckinghamshire
Fitting across Buckinghamshire means planning routes, access and lifting as well as the roof itself. Narrow lanes, shared driveways and town-centre parking restrictions all affect how a large unit is delivered and raised to roof level. We ask about these early so the quote reflects them. That approach is the same everywhere we work in England, from single domestic jobs to multi-unit commercial sites.
- Sun tunnels in Amersham
- Sun tunnels in Aylesbury
- Sun tunnels in Bletchley
- Sun tunnels in Chalfont St Peter
- Sun tunnels in Chesham
- Sun tunnels in Gerrards Cross
- Sun tunnels in High Wycombe
- Sun tunnels in Marlow
- Sun tunnels in Milton Keynes
- Sun tunnels in Newport Pagnell
What's included
- Dust cleared from the room below and the loft
- Rigid or flexible tube run and joined, with as few bends as possible
- Roof opening cut and the flashing fitted to tiles, slates or a flat-roof kit
- Condensation in cold lofts — We insulate the tube where it passes through a cold loft.
- Flat or pitched roof kit — We confirm the roof type and covering before ordering the kit.
Rules that apply in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Common questions in Buckinghamshire
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Do I need planning permission for a rooflight in Buckinghamshire?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
How long does fitting take?
Fitting a sun tunnel into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.

