What the job costs in Ashford
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Ashford
Ashford and the districts around it, TW15, TW18 and TW16, all sit inside our working area. So does the ground between Ashford and Staines (2 miles), and on towards Feltham (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Included in the work
- New vent fitted, sealed and weathered into the roof
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- Existing vent, actuator and upstand surveyed with the specialist
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
- Upstand and weathering — We check the upstand suits the new vent and that the roof around it is sound.
From arrival to clean-up
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a smoke vent rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one to two days per vent.
Regulations for Ashford properties
In England, smoke vents for common stairs must be certified to BS EN 12101-2, provide the free area the fire strategy requires (Approved Document B calls for at least 1 m² at the top of a common stair), and have backup power. Smoke vents have their own energy limit, commonly 3.5 W/m²K. Controls and commissioning are handled by a smoke-control specialist, and building control is involved where the system changes.
Help us quote accurately
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, TW15 or nearby, confirms travel.
Common questions in Ashford
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
What upstand height and roof pitch does smoke vent rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Send a few photos and your TW15 postcode, and we will put together a written quote for the job.

