What the job costs in Stafford
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Stafford we cover
Stafford and the districts around it, ST16, ST17 and ST18, all sit inside our working area. So does the ground between Stafford and Rugeley (8 miles), and on towards Cannock (9 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
What we do on the day
- Certified vent and actuator matched to the opening and controls
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- Old vent removed with the stairwell kept protected below
- Controls and backup power — We confirm the controls, detection and backup power are being dealt with by a specialist.
- Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
A typical installation day
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a smoke vent rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Regulations for Stafford properties
A replacement smoke vent in England has to keep the free area and performance the building's fire strategy relies on, using a vent certified to BS EN 12101-2 with its actuator and backup power. We fit the vent and do the roof work; a smoke-control specialist connects and commissions the controls, and we confirm whether building control needs to be notified.
Before you get in touch
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, ST16 or nearby, confirms travel.
Common questions in Stafford
Do commercial rooflights need planning permission?
Like-for-like replacements on commercial buildings rarely need planning permission. New or larger rooflights on non-domestic buildings and blocks of flats usually need checking with the planning authority, because householder permitted development rights don't apply. We tell you what we know about your building and point you to the right team.
Does commercial rooflight work need building control?
Usually. New openings, structural changes and smoke vents go through building control, and on buildings covered by fire safety law that means a full plans application rather than a building notice. We are not registered with a competent person scheme, so replacements we fit are notified to building control. We confirm the route and show any fee on the quote.
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
For a free, no-obligation quote in Stafford, use the form or call us with the details of your roof.

