Guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Is your address covered?
If you also own a property or a business unit in Motherwell, Coatbridge or Blantyre, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and ML4, ML1 and G71 sit comfortably within that pattern.
What the job includes
- Old vent removed with the stairwell kept protected below
- Controls, detection and wiring handled by the smoke-control specialist
- Upstand checked, adapted or rebuilt to the vent maker's drawing
- Certified as a system — We only fit smoke vents that are certified to BS EN 12101-2.
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a smoke vent rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building warrants and Bellshill
In Scotland, smoke ventilation is covered by the domestic or non-domestic Technical Handbook, depending on the building. Vents must be certified products, keep the required free area, and be connected and commissioned by a smoke-control specialist. A building warrant is needed where the system is altered.
Help us quote accurately
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around ML4 and we will come back with a quote or a survey date.
Common questions in Bellshill
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Will my new smoke vent rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Does a rooflight need a building warrant?
In Scotland a new rooflight needs a building warrant from the council before work starts. Replacing a rooflight complete with its frame doesn't need a warrant, but the new unit must meet the building standards in full, including 1.6 W/m²K. We confirm which applies to your job before you commit.
Planning a smoke vent rooflight in Bellshill? Tell us about the roof and we will come back with a clear price in writing.

