Guide prices
Vent swap
Like-for-like certified vent and actuator, connected to the existing controls and commissioned by a smoke-control specialist
Vent with new controls
Vent plus new control panel and detection, commissioned by a smoke-control specialist
Multiple vents
Several stairwells or larger systems, priced from a survey
Guide ranges for supply & fit; controls and commissioning by a smoke-control specialist. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering CT14 and neighbouring districts
Looking at a property near Deal but not quite in it? We work across CT14, CT13 and CT15 and outwards to Dover, Ramsgate and Broadstairs. Give us the full postcode when you get in touch, because access, parking and the route for a large unit all depend on the exact street. Those details shape the quote for any job around Deal.
Included in the work
- Commissioning and sign-off carried out by the specialist before handover
- Controls, detection and wiring handled by the smoke-control specialist
- Old vent removed with the stairwell kept protected below
- Fire rules near escape routes — We check the roof around the vent for fire rules that affect it.
- Free area at the stair head — We check the free area the vent must provide before choosing a replacement.
How a fitting day runs
On the day, you need to be in at the start and at the end. In between, the fitters get on with it. They will want the room below cleared where possible, a parking spot if you have one, and somewhere to set the unit down safely. After checking the opening and the upstand or flashing, they fix a smoke vent rooflight, seal it and finish the inside. Packaging and any old unit leave with them unless the quote says otherwise.
Planning and building rules in England
A replacement smoke vent in England has to keep the free area and performance the building's fire strategy relies on, using a vent certified to BS EN 12101-2 with its actuator and backup power. We fit the vent and do the roof work; a smoke-control specialist connects and commissions the controls, and we confirm whether building control needs to be notified.
Details that speed up your quote
Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CT14 or nearby, confirms travel.
Common questions in Deal
Who is responsible for the smoke-control system?
The building's responsible person, duty holder or managing agent, depending on the nation, is responsible for keeping fire safety systems working. Our part is the rooflight and roof work; the controls, detection and commissioning are handled by a smoke-control specialist, and the quote says who does what.
Do you cover Deal?
Yes. Fitters travel to addresses in Deal and the surrounding districts, including CT14. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Ask for a quote for your Deal roof. Survey dates are offered based on fitter availability once you are happy with the price.

